Skip to content

Industry

Fusion Energy News

Independent intelligence on the global fusion industry

Friday, June 12, 2026

Vol. III · Edition · Web

All dispatches

Industry · med impact

ITER magnet test facility begins operation - World Nuclear News

Reported by World Nuclear News. Open the original for the full story.

By Fusion Energy News Desk·Thu, 11 Jun 2026 23:44:00 GMT·6/12/2026, 1:41:16 AM·Read at original source
Share

The ITER Organization has announced the start of operations at its Magnet Cold Test Facility following the successful cooldown of the first magnet coil to 4 Kelvin, or minus 269°C.

_98008.jpg) The first toroidal field coil to be tested, seen in the cryostat before the lid was closed (Image: ITER Organization)

_98008.jpg) The first toroidal field coil to be tested, seen in the cryostat before the lid was closed (Image: ITER Organization)

The ITER magnet cold testing programme was launched in 2023 as part of ITER's revised approach to assembly and commissioning. The facility is located in a building at Cadarache, France, previously used by the European Domestic Agency to manufacture ITER's four largest poloidal field coils, and it takes advantage of the building's scale, lift equipment, and proximity to the cryoplant. The facility will allow ITER to test selected superconducting magnets at their operating temperature of 4 Kelvin and up to full current before installation in the fusion machine.

Weekly newsletter

Fusion Energy Weekly

The week in fusion: breakthroughs, companies, and capital — in your inbox. Free, every Monday.

Primary sources

Editorial standards: Fusion Energy News dispatches are compiled from primary filings, peer-reviewed papers, and on-the-record statements. Corrections: desk@fusionenergynews.com

More on Industry