Skip to content
Back to feed

milestones · med impact

TAE Technologies Completes Multi-State Site Evaluation Tour for First Fusion Power Plant

TAE Technologies has concluded its multi-state site evaluation process for its first planned commercial fusion power plant, which will be based on the forthcoming Da Vinci machine.

By Fusion Energy News Desk·10/18/2026, 6:18:41 PM·2 min read·Mon, 28 Sep 2026 18:01:11 GMT·
Reporting
·✓ Editor-verified
Share

TAE Technologies announced the completion of its site evaluation tour across multiple U.S. states, a critical step in selecting the location for its inaugural fusion power plant. The company, based in Foothill Ranch, California, is developing the facility to house its next-generation machine, designated "Da Vinci." This move signals a transition from research and development toward the engineering and construction phases of commercialization. The site selection process is a tangible milestone for the company's plan to deliver fusion-generated electricity to the grid. The announcement did not specify the states under consideration or provide a timeline for the final decision. Source: TAE Technologies

The planned power plant represents the culmination of TAE's decades-long development of its distinct fusion concept. Unlike mainstream tokamak or stellarator designs, TAE Technologies utilizes an advanced beam-driven Field-Reversed Configuration (FRC), a compact toroid plasma confined by a linear magnetic field. This approach aims for high plasma beta and is designed to accommodate an aneutronic proton-boron (p-B11) fuel cycle in the long term, which would minimize neutron-induced material activation. The Da Vinci machine is the intended successor to TAE's current experimental device, Norman (formerly C-2W), which has been used to study FRC plasma stability and confinement at high temperatures. Source: TAE Technologies

The planned power plant represents the culmination of TAE's decades-long development of its distinct fusion concept.

The shift from laboratory experiments to power plant site selection is a significant indicator of maturation within the private fusion sector. For companies like TAE, this process involves complex logistical, regulatory, and financial planning that extends far beyond plasma physics. A successful site selection requires partnerships with local and state governments, utility off-takers, and a robust supply chain. The process itself is a major capital undertaking, demonstrating a company's confidence in its technological roadmap and its ability to attract the substantial investment required for construction. This development follows a broader industry trend of private companies advancing from proof-of-concept experiments to engineering designs for pilot plants. Source: TAE Technologies

Following the conclusion of the evaluation tour, TAE will analyze the collected data to determine the optimal site for the Da Vinci facility. Key factors in this decision will include the availability of a skilled workforce, sufficient land and water resources, supportive regulatory frameworks, and access to electrical grid infrastructure. While the company has not released a public short-list of locations, the chosen site will become a focal point for the next phase of the company's growth. The fusion community and institutional investors will be watching for the final site announcement, as it will represent one of the first commercial fusion power plant projects to break ground in the United States. Source: TAE Technologies

Reporting grounded in coverage from the original publisher — read the source .

Weekly newsletter

Fusion Energy Weekly

The week in fusion: breakthroughs, companies, and capital — in your inbox. Free, every Monday.

Primary sources

Editorial standards: Fusion Energy News dispatches are compiled from primary filings, peer-reviewed papers, and on-the-record statements. Corrections: corrections@fusionenergynews.com · public log

Letters to the editor(0)

Sign in to write a letter

No letters yet. Be the first to write one.